• Suitable for any size and profile pile in marine or dry locations.
• Suitable for any size and profile pile in marine or dry locations.
• Marine Structures
• Marine Structures
• Surface treatment
• Surface treatmentDocuments
HM Fiberglass Reinforced Plastic (FRP) Pile Jacket↓
HM Carbon Fiber Reinforced Plastic (FRP) Pile Jacket↓
Documents
HM Fiberglass Reinforced Plastic (FRP) Pile Jacket↓
HM Carbon Fiber Reinforced Plastic (FRP) Pile Jacket↓ Advantages of FRP Pile Jacket
• Cost and time savings when compared to rebuilding an entire pier by replacing pilings
• Easy installation and modifications in the field
• Non-corrosive
• High strength
• Excellent solvent and chemical resistance
• High abrasion and impact resistance
Advantages of FRP Pile Jacket
• Cost and time savings when compared to rebuilding an entire pier by replacing pilings
• Easy installation and modifications in the field
• Non-corrosive
• High strength
• Excellent solvent and chemical resistance
• High abrasion and impact resistance
Application Range of FRP Pile Jacket
• Jetty Piles
• Bridge Supports
• Offshore Risers
Application Range of FRP Pile Jacket
• Jetty Piles
• Bridge Supports
• Offshore Risers How to Use FRP Pile Jackets
• FRP pile jackets installation
• FRP pile jackets protection
• Bottom sealing
• Grouting
• Top seal
How to Use FRP Pile Jackets
• FRP pile jackets installation
• FRP pile jackets protection
• Bottom sealing
• Grouting
• Top seal
Demarcate the piles where pile jacketing is to be carried out.
All indicated levels of pile protection shall need to be cleaned and free of all loose materials, rust, marine growth and etc by means of scrapping and high pressure water jetting.
Install prefabricated steel cages as reinforcement if necessary as per engineer's requirements.
Install spacer blocks for the required annular spaceas per engineer's requirements
Place and install Pile Jackets as permanent formwork using special made steel collar or clamps with tensioning devices and fasten using stainless steel bolts.
The installed Pile Jackets must be watertight at all joints and at the base to prevent grout leakage.
Pump flowable grout / microconcrete to fill up the internal annular space of the installed Pile Jackets. The grouting procedure shall commence from the lowest inlet grout port and continue until the grout flows out from the top.
Remove the steel clamps after the grout/microconcrete had set.