Gaoyou hospital retrofitting, steel rebar planting

The qualification standard for pullout test is: when pull-out test results conform to the following conditions, it is qualified; the drawing force has reached the design requirement (or has reached the yield value of steel bars), and the reinforcement has not been pulled out. The reinforcement is pulled out, but the form of the damage is that the concrete is destroyed and not the structural adhesive is destroyed.

2018-02-08 15:02:45

Bond steel plate reinforcement,apartment project

The structure drawings on foundation reinforcement joint design, give full play to the advantages of construction "durable, quick construction, flexible and simple lightweight steel plate bonded reinforcement, in order to satisfy the requirements for both the duration and quality, considering the construction convenience and feasibility, the scheme of strengthening technology of steel material properties and process and the construction environment and quality control are described in detail and deepening.

2020-03-24 13:42:54

Replacement of support of Sutong Bridge

Sutong Bridge is located in the eastern part of Jiangsu, connecting Nantong and Changshou City, Suzhou. The total length of the project is 32.4 kilometers, which is composed of three parts: shore connection project, cross bridge project and south shore connection project. Among them, the wiring length of about 15.1 km, the south line of about 9.2 km, about 8.2 km long span bridge.

2018-02-09 19:06:26

What is the principle of CFRP composite strengthening?

the use of the carbon fiber adhesive, can work well, greatly improving the tensile strength of carbon fiber, the carbon fiber reinforcement must first make carbon fiber work together, so the adhesive on CFRP plays a key role, it is necessary to ensure the carbon filaments work together and work together to ensure that the carbon fiber cloth and structure, so as to achieve the objective of strengthening.

2020-03-24 13:41:24

Reinforcement of bridge with epoxy bonded steel plate

The bonding steel plate reinforcement method is to apply epoxy resin series adhesive on the steel plate, and then paste it into the weak part of the reinforced concrete structure's tensile area, the steel plate and the structure form the whole, and the additional reinforcing bar is added.

2020-03-24 13:40:32

Which buildings need seismic strengthening?

In order to protect the life and property, the building have to do seismic strengthening. However, some buildings have not been aseismatic in the design and construction, which requires the seismic identification and reinforcemen . In particular, the old buildings, such as the general hotel, need to be identified as a whole in the new era and to be reinforced in accordance with the design.

2020-03-24 13:39:00
 320   first Previous 46 47 48 49 50 51 52 53 54 Next last 
Back
Top
Close