Carbon Fiber Sheet (CFS) To Reinforce Concrete Structures

Carbon Fiber Sheet (CFS) To Reinforce Concrete Structures

Project


Carbon Fiber Reinforcement Project of Floor Floor Slab No. 19 of Wuyi Farm Staff Residence of the 12th Division of Agriculture

The 51st Farm of the Twelfth Division of the Corps has a rectangular plan, six floors above the ground (underground one), brick-concrete structure, and a total construction area of 4974.35m2. After delivery, some residents reported that the roof of the house had cracks and the roof of the living room was deformed and warped. In order to ensure the safety of the main structure of the project, structural reinforcement design must be carried out. The structure reinforcement inspection center is designed to reinforce the partial cracked beams and plates with carbon fiber sheet.


Carbon Fiber Sheet (CFS) To Reinforce Concrete Structures



Carbon Fiber Sheet (CFS) To Reinforce Concrete Structures



The reinforcement material is a carbon fiber sheet with a specification of 300g/m2, a thickness of 0.167mm, and a modified epoxy resin adhesive. Its safety performance must meet the requirements of "Specification for Design of Reinforcement of Concrete Structures GB50367-2013" and "Technical Regulations for Reinforced Concrete Structures with Carbon Fiber Sheets CECS146:2003 (2007 Edition)". The construction started on June 10, 2016, and the materials used were unidirectional carbon fiber sheets and carbon fiber adhesives. The construction was completed on July 26 of the same year. The construction quality complies with the design and relevant regulations and passed the quality acceptance smoothly.


Carbon Fiber Sheet (CFS) To Reinforce Concrete Structures






Benefit analysis of carbon fiber sheet reinforcement

The construction with carbon fiber sheet method can effectively control the construction period without affecting the construction of other types of work. The carbon fiber reinforcement project of the floor slab of the Wuyi Farm Staff Residence 19# of the 12th Division of Agriculture, the carbon fiber sheet paste area is 3900m2, the construction period is 50 days, and the project cost is 1.15 million yuan. If the traditional reinforcement method is adopted, the construction period will reach 95 days and the construction cost will reach 1.96 million yuan. Adopting carbon fiber sheet paste reinforcement method, the construction period is saved by 47%, and the project cost is reduced by 41.5%.