Old Park Upgrade and Reconstruction Project

For the columns and beams that do not meet the safety requirements, the reinforcement methods such as pasting steel plates and pasting carbon fiber cloth are adopted.

The construction area of this project is 195,000 square meters, covering an area of 65,000 square meters. The building involved in the renovation is a 3-story frame structure, and the foundation is an independent foundation. This is a typical project of functional conversion due to the upgrading and use requirements of the old reformer.


The main construction contents include:


① For the foundation with insufficient bearing capacity, the method of strengthening the foundation by increasing the section is adopted;


② For the columns and beams that do not meet the safety requirements, the reinforcement methods such as pasting steel plates and pasting carbon fiber cloth shall be adopted.


steel plate for column


carbon fiber for beam